GPS Pet Trackers for Dogs and Cats Mini Bluetooth 5 Colours
Couldn't load pickup availability
Delivery and Shipping
Delivery and Shipping
Shipping Costs
- Free Standard Shipping over $29 within Australia (excl. bulky items*).
- Standard Shipping Within Australia- Flat Rate $6 below $29
- Express shipping within Australia (excl. bulky items*) - Flat rate of $13 for orders below $29 and $10 for order over $29
- Most products are shipped by Australia Post, Sendle, PFL Logistics, and Courier Please.
Shipping times
- Standard delivery usually takes 2 - 8 business days depending on your parcel destination (8-10 business days for western states and remote areas).
- Depending on your parcel destination, express delivery usually takes 1 - 5 business days.
- Please expect delays on holidays or during high-volume seasons.
In-store pickup
- Orders can be picked up Monday - Friday (excluding public holidays), 9:30 am-5 pm. An email will be sent when your order is ready for pickup.
- Pickup address:Â
19 Berry St, Clyde NSW 2142 - Tel: +61 1300 512 485
Description
Keep your beloved pets safe and secure with our advanced GPS Pet Tracker. This innovative device allows you to track your pet's location in real-time, ensuring peace of mind whether you are at home or away. Designed to be compact and lightweight, this tracker is perfect for pets of all sizes.
The dog GPS locators uses cutting-edge GPS and Bluetooth technology to provide accurate location tracking. With the user-friendly mobile app, you can easily monitor your cats or dogs movements and set safe zones to receive instant alerts if your pet strays beyond designated areas. This feature is particularly useful for preventing lost pets and ensuring their safety at all times.
Our GPS Pet Tracker is also equipped with a long-lasting battery, ensuring that you can track your pet's location for extended periods without frequent recharges. The durable and waterproof design makes it suitable for all weather conditions, allowing your pet to roam freely without compromising the tracker's functionality.
Features
- Real-Time Tracking: Provides accurate location tracking through GPS and Bluetooth technology.
- Safe Zones: Set safe zones and receive instant alerts if your pet leaves the designated area.
- Long Battery Life: Extended battery life for prolonged tracking without frequent recharges.
- Durable and Waterproof: Suitable for all weather conditions, ensuring durability and reliability.
- User-Friendly App: Easily monitor your pet's movements and manage settings through the mobile app.
Specifications
- Material: High-quality plastic and electronic components
- Dimensions: 4 cm x 4 cm x 1 cm
- Weight: 30 grams
- Color: Black/Blue/Green/Red/White
- Battery Life: Up to 7 days on a single charge
- Connectivity: GPS and Bluetooth
- Suitable for: Pets of all sizes
Package Includes
- 1 x GPS Pet Tracker
- 1 x USB Charging Cable
- 1 x User Manual
Note
- Manual measurement may have a 1-3 cm error.
- Due to lighting effects, there may be a slight color difference.
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.





















